|
|
HEAVY DUTY SHORING & FALSEWORK
SYSTEMS
25 Kip/Leg (11,340 kg) Equipment
The SCI 25K Leg (11,340 kg) shoring system is the most favored Heavy Duty Shoring Equipment in this capacity range used by contractors
around the world. Designed and manufactured for years of heavy duty use, when very heavy
loads are encountered, SX-25 Kip/Leg (11,340 kg) is the answer. When properly braced
and/or guyed, this system will work to full capacity for shoring heights of up to
60'-0" (18.29 m). SCI's 25K/Leg shoring equipment, aluminum joists, and steel stringers were used to form this massive cast-in-place post tensioned box girder bridge which is one the largest of it's type in the United States, to become part of the I-84 Interstate Highway System in Connecticut. |
25K/Leg (11,340kg) Falsework Equipment, Aluminum Joists
& Steel Stringers were used for the construction of this cast-in-place reinforced
concrete bridge project at La Guardia International Airport, New York, NY, USA. |
For information on other SCI Falsework & Shoring systems click on a link below
|
|
Structural Contours, Inc. designs sytems for shoring, post shoring, shoring jacks, falsework, scaffolding,
|