|
THE PATENTED
MODULAR ALUMINUM FORMWORK SYSTEM

ENGINEERING SERVICES
Falsework
& Formwork, just as with all equipment and materials needed during the construction
process, must be designed and engineered very carefully. This will create ease of use and
handling while constructing one-story single family housing or multi-story multiple family
housing.
SCI's
engineers and technicians diligently review and study the plans and specifications that
are submitted to us. All architectural and structural features are incorporated into the
engineering drawings. We then determine those revisions that can be made which will
further add to the economics of the project, but yet maintain or strengthen the desires of
the architect, engineer or developer of record, and present such revisions for approval.
After the final design(s)
have been satisfactorily established, we then go through a final developmental process
which leads to SCI's formalizing the Bill of Materials & Equipment for the project.
Whenever concrete stairs
are specified, SCI will make recommendations for the site pre-casting of these elements.
(If possible and practical) We also advise on the safe, correct manner in which these
stair units must be lifted by crane and set into their permanent position within the
structure.
Every client receives
several sets engineering drawings and details that provide the precise locations of every
piece of Globalite® Systems equipment for each concrete structure. SCI also advises our
clients how to safely erect or install, remove, handle and care for the equipment during
the construction of the buildings. There is no sparing of safety and quality in any piece
of equipment or procedural mechanism put into place by SCI. Workers are fully trained by
SCI and become quite competent after a brief learning period. Most of the labor force used
with Globalite® Systems is unskilled, with a minimum of skilled supervisory personnel.
|