glogo3.gif (2827 bytes)
glun2.gif (1714 bytes)

. . . . . . . . . . . . . . . . . .   Step 4   . . . . . . . . . . . . . . . .

View4.gif (13747 bytes)

  • Inspect GlobaliteŽ Forms to be sure that they are straight & plumb.
  • Be sure that  all GlobaliteŽ Form Ties are in place and pinned.
  • Place concrete into forms and vibrate properly throughout wall form system, trowelling the top of the concrete wall to a smooth finish.

  [ Next | Back ]