- Be sure that grade has been properly
leveled and load tested if necessary.
- Erect GlobaliteŽ Foundation Forms,
following the engineered form layout drawings and details provided by SCI.
- Install 6 mil Vapor Barrier if required.
- Install Welded Wire Reinforcing or
Reinforcing Bars.
- Place concrete and finish to
specifications.
- Protect concrete from adverse weather
conditions if necessary during curing period.
[ Next | Back ]
|