glogo3.gif (2827 bytes)
glun2.gif (1714 bytes)

. . . . . . . . . . . . . . . . . .   Step 1   . . . . . . . . . . . . . . . .
step1.jpg (31829 bytes)

 
  • Be sure that grade has been properly leveled and load tested if necessary.
  • Erect GlobaliteŽ Foundation Forms, following the engineered form layout drawings and details provided by SCI.
  • Install 6 mil Vapor Barrier if required.
  • Install Welded Wire Reinforcing or Reinforcing Bars.
  • Place concrete and finish to specifications.
  • Protect concrete from adverse weather conditions if necessary during curing period.

  [ Next | Back ]